Build progress – 01/07/2014

The build is absolutely racing on through the village, with the beginnings of the cabinet opposite the Village Hall now installed and many more fibre connection points being installed every day! Griffiths Close is almost entirely done well ahead of schedule and the main road (Church Road) is looking like it’ll be done later this week! Click on the photos below for full size versions.

72 fibres winding their way down the road

72 fibres winding their way down the road

Cabinet plinth and power cabling

Cabinet plinth and power cabling

The contractors at work on the road

The contractors at work on the road

Connection points, ready for fibre to the premises

Connection points, ready for fibre to the premises

More fibre ready to go in the ground!

More fibre ready to go in the ground!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s